Projects
Winn Dixie Seawall
Construction of a 750’ Seawall using 20’ Fiberglass Sheet Piles.
Wall Springs Park Improvements
Construction of a Boardwalk and Pier using Composite decking, Timber foundation piling, and upright piles for gazebos.
Tarpon Springs Kayak Launch
Construction of a new boardwalk/pier leading to a prefabricated custom ADA floating dock built for handicap access for launching kayaks.
Pasadena Boardwalk
Construction of a new waterfront boardwalk in front of City hall. All Composite decking and handrail on wood foundation piling.
Orange Lake Docks
Midcoast teamed up with a good friend Augustine Construction to build this new site and docks.
Hernando Transfer Station
Construction of a new boat transfer station built on 60’ Steel H Piles, Steel Framing, new lift components, floating docks and electrical
Clermont Floating Docks
Construction of a 300’ Seawall, Boat Ramp, Floating Docks, and Parking Lot
Caladesi Island Bulkhead Seawall
Construction of 1500 Lineal Feet of Vinyl Seawall and Cap
Bayport Pier
Construction of a Wooden Fishing Pier using Timber Piling, PT Decking, Composite Handrailing, & Stainless Steel Hardware.