Hernando Transfer Station
- Owner: Hernando County
About this Project
Construction of a new boat transfer station built on 60’ Steel H Piles, Steel Framing, new lift components, floating docks and electrical.
Special Construction Aspects: This project required our 110 Ton Crane to set the steel H Piles and driven through the rock. The uniqueness of this structure is that it separated lake from the Gulf of Mexico. Now all the residents living on the lake use the transfer station to take them from fresh to salt water.